
EMS Components Assembly Inc.
EMS, an electronic and semiconductor manufacturing company located in Laguna, signed with Buskowitz Energy in September 2019. Buskowitz Energy installed a 264kWp solar PV system, sufficiently providing the required energy needed.
- Solar panels: 274 pcs of 365 Canadian Solar Solar Panels
- Mounts: Mibet racking
- Inverters: 4 units of Canadian Solar 60
The solar installation is also net-metered to MERALCO.