Coca-Cola Beverages Philippines Inc. (CCBPI – MOP) is a project handled by Buskowitz Energy located at Villanueva, Misamis Oriental, signed in April of 2019. The system size installed is 2.801 MWp which caters to the required energy by the establishment. The PV Solar system is beneficial not only for the company but also for the environment by having a positive environmental impact.

  • Solar panels: 700 pcs of 400W Canadian Solar Solar Panels
  • Mounts: Mibet racking
  • Inverters: 22 units of SolarEdge 100

The solar installation is also net-metered to CEPALCO.